Vendor management: certificates, bids and purchase orders
Vendor management comes down to three habits: keep every vendor's insurance and licenses current before they work, compare bids on the same scope, and match every large bill to a purchase order and the bid you awarded. Each habit catches a different kind of loss.
Vendors do most of the physical work in property management, and most of the money that leaves an operating account goes to them. Weak vendor management shows up as uninsured contractors on a roof, bids that can't be compared, and bills nobody can match to an approval. This post covers the three controls that prevent those problems, with the checks and the math.
Part 1: Certificates of insurance and licenses
Before a vendor works on a property, you should have their certificate of insurance (COI) on file and current. The coverage types and limits you require are a decision for you, your owners and your insurance advisor. This is not legal or insurance advice. The operational checks are the same everywhere:
- The named insured matches the vendor's legal name on your vendor record.
- Each policy you require is listed. One certificate often lists several policies; track each one separately.
- Each policy's limits meet your requirement.
- Your company, and the owner if required, is listed as additional insured where you require it.
- Each policy's expiration date is recorded, not just the certificate date.
- Any trade license or registration the work needs is on file, with its number and expiration.
Then set two rules. First, warn 30 days before any policy or license expires and ask the vendor for the renewal. Second, decide what happens on expiry: most companies stop assigning new work to that vendor until the renewal arrives. Record exceptions deliberately, for example a supplier that never works on site and doesn't need insurance on file, or a sole proprietor exempt from workers' compensation who has given you their exemption letter.
Part 2: Bids
Not every job needs bids. A common rule: one trusted vendor for routine work under a set amount, at least two bids above it, and three for capital projects. The hard part is not collecting bids, it is making them comparable.
Write the scope before you ask
- What exactly is being done, in measurable terms: square feet, linear feet, number of fixtures.
- Materials, by grade or spec, or let vendors propose with the spec stated.
- What is excluded: permits, disposal, patching, painting.
- Access and timing: occupied units, working hours, deadline.
- Warranty expected on labor and materials.
Compare like with like
Suppose you ask three roofers to replace a section of flat roof at 18 Elm Court:
- Vendor A: $4,200, includes disposal, 5-year labor warranty
- Vendor B: $3,850, excludes disposal (quoted separately at $450), 2-year labor warranty
- Vendor C: $5,100, includes disposal and replacing two damaged drains, 10-year labor warranty
On the same scope, Vendor B is $3,850 + $450 = $4,300, which is more than Vendor A. Vendor C includes work the others left out. If the drains need doing anyway, ask A and B to price them before you decide. The lowest number on the page is often not the lowest price for the job.
Repair or replace?
For equipment, compare cost per year of useful life, not the price today. Say a 14-year-old boiler needs a $1,200 repair that a technician expects to keep it running about 3 more years, or a $9,000 replacement expected to last about 20 years:
- Repair: $1,200 / 3 years = $400 a year, plus the risk of another failure in that time
- Replace: $9,000 / 20 years = $450 a year, plus any lower running cost
Close numbers like these turn on the other factors: energy savings, the cost of an emergency failure in winter, and the owner's plans for the property. Put the math in front of the owner and let them decide.
Part 3: Purchase orders
A purchase order (PO) is a written approval for a vendor to do specific work, or deliver specific goods, for a set price before the bill arrives. It turns an approval into a record you can match. A common rule: require a PO for any job over a set amount and for every project.
What a PO should include
- Vendor, property and unit
- Scope or items, linked to the awarded bid where there was one
- Amount, and whether it is fixed or not-to-exceed
- Who approved it and when
- The expense account or project it is charged to
Match every bill
When the bill arrives, match it before it is paid. Check three things: the bill matches the PO, the PO matches the awarded bid, and the bill hasn't been paid before. If a bill is more than the PO, it goes back for approval of the difference. For example, a PO for $4,200 and a bill for $4,650 needs a $450 change approved, with the reason, before payment.
Watch for duplicates
- Same vendor, same amount, within 30 days
- Same invoice number, with or without a suffix
- A bill for work already billed on another work order
- A bill sent to two properties for the same job
Onboarding a new vendor
- Collect the vendor's legal name, tax form, contact details and after-hours number.
- Collect the certificate of insurance and any trade licenses, and record each expiration date.
- Agree on rates for routine work, call-out fees and emergency rates in writing.
- Set how the vendor receives work orders and sends bills, and require the work order or PO number on every bill.
- Start with one or two small jobs before assigning larger work.
Score your vendors
Once a quarter, look at each regular vendor: response time on emergencies, bills that went over the PO, callbacks for the same problem, and resident comments. Keep the list short. A few reliable vendors who know your properties are worth more than a long list nobody has vetted.
How Zrico helps
Zrico tracks each vendor's insurance policies from their COI and their licenses, with expiration dates, flags anything expiring in 30 days or already expired, and records exceptions per vendor. You can request bids, compare bids, get a repair-or-replace suggestion that uses the lowest bid as the quote, and raise purchase orders for a property or project. Bills are matched to the purchase order and awarded bid, with a check for duplicates. Vendor scorecards and the vendor portal are part of /product/maintenance. The maintenance agent at /ai/agents/maintenance triages requests and drafts work orders, and assigning a vendor waits for a person by default; an admin can let Zrico book vendors under your spending limit in Settings. Bill entry and payment controls live in /product/accounting.